National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
To Dvur Kralove by train - Transfer Terminal in Dvur Kralove nad Labem
Šlesingerová, Veronika ; Hora, Jan (referee) ; Ponešová, Barbora (advisor)
The subject of this architectural and urban study is to design a new transfer terminal in Dvůr Králové nad Labem. The terminal has to associate the existing bus lines and the new train line using the existing track, which connects to the train station located on the outskirts of the city. At the same time, the town deals with the issue of train and bus services. It came with a proposal to extend the track closer to the city and at the same time move the existing bus station to one place. This creates a direct train-bus transfer. The aim of the project, however, is to design not only the transport terminal, but to create a new public space with the use of the city itself.
The Study of Continuous Material Flows Management with Using Products Identification
Šíbl, Josef ; Šebela, Michal (referee) ; Jurová, Marie (advisor)
Introduce grauation work contains the detail characteristic of the marking of material elements incoming to store and work out from store. The main part of the work is aimed to shortening working time during material entry and work out from store. On ground ride out analyse has been suggested optimal soluti-on implementation marking of material elements into production company. Optimal type barcode has been designed and time schedule to implementation marking of material elements has been described. The technic-economical analysis proposed solution SAP console describing type and price component need to implementation this solution.
To Dvur Kralove by train - Transfer Terminal in Dvur Kralove nad Labem
Šlesingerová, Veronika ; Hora, Jan (referee) ; Ponešová, Barbora (advisor)
The subject of this architectural and urban study is to design a new transfer terminal in Dvůr Králové nad Labem. The terminal has to associate the existing bus lines and the new train line using the existing track, which connects to the train station located on the outskirts of the city. At the same time, the town deals with the issue of train and bus services. It came with a proposal to extend the track closer to the city and at the same time move the existing bus station to one place. This creates a direct train-bus transfer. The aim of the project, however, is to design not only the transport terminal, but to create a new public space with the use of the city itself.
The Study of Continuous Material Flows Management with Using Products Identification
Šíbl, Josef ; Šebela, Michal (referee) ; Jurová, Marie (advisor)
Introduce grauation work contains the detail characteristic of the marking of material elements incoming to store and work out from store. The main part of the work is aimed to shortening working time during material entry and work out from store. On ground ride out analyse has been suggested optimal soluti-on implementation marking of material elements into production company. Optimal type barcode has been designed and time schedule to implementation marking of material elements has been described. The technic-economical analysis proposed solution SAP console describing type and price component need to implementation this solution.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.